APPLICATION AND PROPERTIES
• CEKOL TERMO S1 is applied to sticking the thermal insulation of polystyrene to mineral surface, inside and outside the facilities.
• CEKOL TERMO S1 is part of the heating system CEKOL TERMO S. The system includes:
Primer to the surface CEKOL DL-80
Primer to the surface CEKOL DL-80
Adhesive for polystyrene CEKOL TERMO S1
Adhesive for grid embedding CEKOL TERMO S2
Primer for plastering CEKOL GB-87
Mineral plaster CEKOL C-35
Instructions for use
The surface preparation
Remove the residues of emulsion and oil paints as well as loose grains of sand using a spatula. The surface should be clean, closed and free from grease.
Priming
High-absorbed surfaces and exposed to moisture should be grounded with the priming emulsion
Mortar preparation
Pour the package contents to cold water in a ratio of 5 to 5.5 litres of water per 25 kg bag and mix thoroughly, preferably with a mechanical stirrer. Then wait for approximately 3 minutes and again mix well. The time of mortar application approx. 3 hours.
Application
In order to stick the thermal insulation of polystyrene, apply the adhesive in points using no less than 12 points on 1m², the volume of not less than 120cm³ each. Additionally, on the polystyrene boards, apply mortar on the edges to form a frame around the board of a width of 3 cm and a thickness of approx. 1 cm. Stick the insulating boards up to 20 minutes after the mortar has been applied on the polystyrene. The insulating boards arrangement can be adjusted up to 10 minutes since they have been sticked. Performance: polystyrene sticking – approx. 4 kg/m². The temperature of the performed works: from +5ºC to +25ºC.
Technical data
- Meets requirements PN-EN 13499 ETICS-EPS-EN 13499-2.5-F-I2-PE200
- Adhesive mortar for gluing of foamed polystyrene boards in the CEKOL TERMO S thermal insulation system
- The declared thermal resistance for polystyrene of a thickness of 100 mm, λ 0,04 W/m∙K 2.5 m²∙K/W
- Reaction to fire Euroclass F
- Impact resistance I 2
- Resistance to crushing PE 200